MIM was appointed to deliver the complete mechanical installation of three 40-ton industrial boilers as part of a major upgrade at a live operational facility in the UK.

Working under tight access constraints and alongside ongoing site operations, our team successfully managed the precision lifting, maneuvering, and positioning of the oversized units into a newly constructed boiler house. The project required detailed logistical planning, specialised lifting equipment, and close coordination with the client and main contractor to minimise disruption and ensure safety throughout.

Scope of Works Included:

  • Offloading and handling of heavy-duty boiler units (each approx. 40 tonnes)
  • Complex rigging and tandem lifting operations
  • Internal movement and alignment into final positions
  • Installation of boiler support infrastructure
  • Compliance with site-specific health, safety, and environmental protocols